Whitepaper The plan
Roadmap
The plan of work, dated and checkable. What we make, not what it is worth.
We once said "no roadmap". We meant no promises. This page is different: it is a plan of work, with dates, and every finished item links to the thing itself. It is about what we build. It is not a forecast, and nothing on it should be read as a reason to expect a return.

Phase 0 · The job #
DoneSep 29 to Oct 7, 2026
Build the world before the coin.
- Done: Brand locked: Glitch, the official profile picture, the logo and the wordmark
- Done: glitchonsol.com live on its own domain
- Done: The ATM, with the heat meter, PIN jokes and the worldwide counter
- Done: The meme vault: over a hundred memes, GIFs and wallpapers, free to post
- Done: Glitch County: crew, map and Glitch FM 99.9
- Done: Wanted: poster maker, crew kit, board and receipts
- Done: Make the news
- Done: Sticker packs for Telegram, WhatsApp and Discord
- Done: Withdraw Wars
- Done: Heat Run built; closed at launch and reopening with the arcade in Phase 2
- Done: The GTA 6 countdown: calendar feeds, embeddable widget, daily cards
- Done: Privacy page, anonymity pass, strict security headers
Phase 1 · Casing the joint #
In progressOct 8, 2026 to launch
Get everything ready that a launch needs, and rehearse the parts that cannot be undone.
- Done: This whitepaper and roadmap
- To do: Copycat warning pinned on X
- To do: Daily posting until launch
- To do: Telegram announcement channel
- To do: Sticker sets published on Telegram and WhatsApp; GIPHY channel
- To do: Domain and email hardening: SPF, DMARC, DNSSEC
- To do: Infrastructure for a launch spike: paid hosting plan, a Jupiter API plan for the swap
- To do: Throwaway coin rehearsal on mainnet: creation settings and the card's burn check
- To do: Glitch Card rehearsal on the test network, then two real cards on mainnet
- To do: Buy guide by region
- To do: A session with counsel on marketing wording and jurisdictions
Phase 2 · The withdrawal #
In progressFrom Oct 16, 2026
The coin exists. Everything promised about it becomes checkable.
- Done: $GLITCH created on pump.fun on Oct 16, 2026; address on the site
- To do: Live on-chain checks on the home page
- To do: DexScreener profile; Jupiter verification; CoinGecko and CoinMarketCap applications
- To do: Blank Glitch Card sale opens, wave one of four
- To do: Founder marking recorded for first-days wallets
- To do: Card activation opens, burn amounts published and fixed
- To do: The Glitch Arcade opens: Heat Run, the getaway runner, and Who's the Rat?, the heist party game for 4–10 players. Both are built; coming soon
- To do: Make your Glitch: the profile-picture builder, with hats, shades, chains, backgrounds and a Roll button. Built; coming soon
- To do: The Glitch shop: Drop 01, sticker sheets, holo stickers, a five-button set and an embroidered patch, sold and shipped by Fourthwall. Made; coming soon
Phase 3 · Heat #
PlannedNov 12 to Nov 19, 2026
The last week of the glitch.
- To do: Pre-load day, Nov 12: a county event and a fresh meme drop
- To do: Withdraw Wars finale: the final country standings
- To do: Launch-week memes in the vault
- To do: The countdown hits zero at local midnight, and the ATM gets its "patch" moment on the site
- To do: Burn reports continue weekly
Phase 4 · After the patch #
PlannedNov 20 to Dec 31, 2026
A place does not stop existing when a countdown ends. The county's second act.
- To do: The fiction continues: the technician came, the ATM still works, nobody knows why
- To do: Glitch Card upgrade season opens
- To do: County leaderboards and community burn milestones that unlock new art
- To do: New Heat Run zones and modifiers
- To do: The Game Awards night, Dec 10, as a community event
- To do: Holder channels with tier roles, once verification is tested
Phase 5 · 2027 #
Ideas2027
Not commitments. Things we would like to build, in the order the crew votes for them.
- To do: More playable county: new games on the site, seasons for Heat Run
- To do: Community-made content: a submission pipeline for posters, memes and radio segments
- To do: More merchandise drops, only through a named partner with a real legal counterparty (Drop 01 moved to Phase 2)
- To do: Whatever the crew votes for
What is not on this roadmap #
- Exchange listings. We apply where it makes sense and announce when it happens. We do not promise them.
- Price targets, market-cap goals or "next stops". Never.
- Partnerships we have not signed.
- Any feature that pays holders. See Risk and disclaimers for why.
How to follow it #
Finished items get a link to the live thing. Changes to this page are listed in the Changelog and announced on X. If a date slips, we say so and move it. We do not quietly delete it.